| एमओक्यू: | 1 |
| कीमत: | To be quoted |
| मानक पैकेजिंग: | सुरक्षा दफ़्ती पैक या प्लाईवुड बॉक्स |
| भुगतान विधि: | T/T |
Condensation Tester
Brief Introduction:test defrosting time and water evaporation after refrigerator’s freezer is turned off light
Meet standard:meet requirements of GB4706.13,IEC60335-2-24 Chapter 11
Technical Parameters
material:insulating Nylon plate
Power:max 6W;
Heat conduction transfer:red copper
| एमओक्यू: | 1 |
| कीमत: | To be quoted |
| मानक पैकेजिंग: | सुरक्षा दफ़्ती पैक या प्लाईवुड बॉक्स |
| भुगतान विधि: | T/T |
Condensation Tester
Brief Introduction:test defrosting time and water evaporation after refrigerator’s freezer is turned off light
Meet standard:meet requirements of GB4706.13,IEC60335-2-24 Chapter 11
Technical Parameters
material:insulating Nylon plate
Power:max 6W;
Heat conduction transfer:red copper